Prototype v0.9 · TrusTwin™ module page · T1 template instance #1
Layer 5 · Regulatory & ESG · TrusTwin™

Schedule M to BRSR. Audit-ready in hours.

TrusTwin™ ships with India's regulators pre-mapped to plant-floor controls. Schedule M (revised 2024), BRSR Core, IATF 16949, IS 14489, PESO, CPCB — every control framework, every disclosure cycle, every audit pack — automated against your live twin data.

1,247 controls pre-mapped
6 Indian regulators
ALCOA+ data integrity
// AUDIT PACK
6 / 6 regulators
// CONTROLS
1,247 PASS
// AUDIT PREP
4 hrs · was 40
1,247
Controls pre-mapped (Schedule M)
6 / 6
Indian regulators built in
40 → 4 hrs
Audit prep compression per cycle
100%
ALCOA+ data integrity by design
In 30 seconds

What TrusTwin™ does.

// 01

Maps every control to your plant.

BRSR Core, Schedule M, IATF, IS, PESO, CPCB — every clause, every sub-clause — mapped to the sensor, system, or document in your plant that proves it.

// 02

Watches every control in real time.

Live status: PASS, DUE, NON-CONFORMITY. Drift alerts before the auditor walks in. CAPA workflows tied to the originating control.

// 03

Generates audit packs on demand.

One click. Every disclosure traces back to its sensor, system, or document. PDF for inspectors. Structured XML for regulators.

Built for

EHS Heads who walk into audits with everything ready.

Most plants spend 40+ hours per audit cycle gathering evidence — pulling logs, copying SOPs, photographing equipment. TrusTwin replaces that with a single dashboard. Evidence is captured continuously. Audit packs assemble automatically.

Primary buyer

EHS Head · Quality Head · Statutory Officer · CFO

// THE PAIN

Each audit cycle costs 40+ hours of manual evidence gathering. Schedule M revised 2024 caught us flat-footed — we discovered control gaps a week before the inspector arrived. BRSR Core deadline is non-negotiable for top-1000 listed entities. There is no path to compliant without automation.

// SUCCESS METRICS

↓ 90%
Audit prep hours
0
NCRs at audit
100%
Controls automated
How it works

Four steps. Connect to audit pack.

Typical pilot deployment — 8 to 12 weeks from kickoff to first generated audit pack. No rip-and-replace. We map to what you already have.

// 01 · CONNECT

Your existing controls.

CAPA logs, SOPs, batch records, audit trails, calibration logs. TrusTwin reads from your existing ERP, MES, LIMS — no migration.

// 02 · MAP

Indian regulators imported.

Each Schedule M sub-clause, each BRSR Core indicator, each IATF clause mapped to your specific plant controls.

// 03 · WATCH

Real-time status.

Every control: PASS, DUE, or NON-CONFORMITY. Drift alerts. CAPA workflows. Pre-audit dashboard for EHS / QA heads.

// 04 · REPORT

One-click audit pack.

PDF for inspectors, structured XML for regulators. Every disclosure traces back to its underlying sensor or document.

Capabilities

What TrusTwin™ ships with on day one.

SM

Schedule M (revised 2024)

1,247 control framework pre-mapped for Indian pharma plants. ALCOA+ by design.

BR

BRSR Core

Nine-indicator framework automated for SEBI top-1000 listed entities.

IA

IATF 16949:2016

Auto-ancillary Tier-1 OEM audit framework. Customer-specific extensions.

IS

IS 14489:2018

BIS Occupational Safety & Health Audit code. Indian-context controls.

PE

PESO + CPCB

Petroleum, explosives, hazardous waste manifests, stack monitoring auto-mapped.

50

ISO 50001:2018

EnPI tracking aligned with VolTwin™ energy data.

A+

ALCOA+ Data Integrity

Attributable, Legible, Contemporaneous, Original, Accurate, +Complete +Consistent +Enduring +Available.

CA

CAPA Effectiveness

Closure verification on every CAPA, tied back to the originating control.

FD

CDSCO + USFDA-aligned

Indian regulators map to USFDA expectations for export-bound formulations.

EX

Audit Pack Export

One-click PDF for inspectors. Structured XML for regulators.

DR

Drift Alerts

Pre-audit alarms when any control trends toward non-conformity.

MP

Multi-Plant Rollout

Hub-and-spoke architecture. Central TrusTwin reads from local plant deployments.

Regulator mapping

Indian regulators built in.

Not a "compliance template you fill in." The actual control frameworks. Pre-mapped to plant-floor controls.

Regulator
Applies to
Controls
Status
Schedule M (revised 2024)Drugs & Cosmetics Rules · CDSCO
All Indian pharma manufacturing units. ALCOA+ data integrity, equipment qualification, cleaning validation.
1,247
LIVE
BRSR CoreSEBI · top 1000 listed entities
Mandatory for top 1000 listed by market cap. Nine indicators across environment, social, governance.
9 + 67
LIVE
IATF 16949:2016International Automotive Task Force
Automotive Tier-1 suppliers. Customer-specific requirements supported per OEM.
412
LIVE
IS 14489:2018BIS · Occupational Safety & Health
All large Indian manufacturing plants. State-level safety audit code.
186
LIVE
PESOPetroleum & Explosives Safety Org
Chemical, petrochemical, gas plants. Hazardous storage, transfer, manifests.
94
LIVE
CPCB / SPCBPollution Control Boards · MoEFCC
Stack monitoring, hazardous waste, water/effluent. Multi-state coverage.
142
LIVE
ISO 50001:2018Energy Management Systems
Optional for ISO 50001 certification. Aligned with VolTwin™ energy data.
78
LIVE
Plant-floor truth

Numbers we can defend.

Indian plants. Indian audits. Indian outcomes. Verified across our deployments since 2024.

40 → 4hrs
Audit prep compression per cycle. Across pharma, auto, chemical pilots.
0NCRs
Non-conformities at the inspector's audit. Six of seven customer audits in 2024–2025.
9mo
From deployment kickoff to first successful Schedule M audit pack.
1,247
Schedule M revised 2024 controls auto-mapped — the framework, out of the box.

Source: Wistwin internal benchmark across 7 active TrusTwin deployments, January 2024 – April 2026.

FAQ

Questions buyers actually ask.

TrusTwin™ is the compliance and audit module of the Wistwin® digital twin platform. It ships with India's regulator frameworks (Schedule M revised 2024, BRSR Core, IATF 16949, IS 14489, PESO, CPCB, ISO 50001) pre-mapped to plant-floor controls. Indian manufacturers use TrusTwin to compress audit preparation from 40 hours per cycle to under 4 hours, and to maintain continuous audit-readiness rather than scrambling in the days before an inspector arrives.
Schedule M (revised 2024) — 1,247 controls for pharma. BRSR Core — SEBI's nine-indicator ESG disclosure for top-1000 listed. IATF 16949:2016 — auto-ancillary Tier-1 audit framework with customer-specific extensions. IS 14489:2018 — BIS Occupational Safety & Health Audit. PESO — petroleum, explosives, hazardous waste. CPCB / SPCB — pollution control boards, multi-state coverage. ISO 50001:2018 — energy management. Additional regulators are added quarterly based on customer demand.
Generic Governance/Risk/Compliance tools are forms-and-folders systems — they store the documentation but they have no connection to your live plant. TrusTwin is built on Wistwin's digital-twin foundation, which means every control is wired to a specific sensor, system, or document. When the sensor reading drifts, the control status changes automatically. No manual data entry. No spreadsheet reconciliation. This is the difference between a compliance system and a compliance twin.
Yes. All 1,247 controls in Schedule M revised 2024 are pre-mapped in TrusTwin's framework library. During pilot deployment, our team maps each control to your plant's specific equipment, SOPs, and batch records. The pilot timeline is 8–12 weeks from kickoff to a first generated, inspector-ready Schedule M audit pack.
No — TrusTwin integrates with your existing CAPA system (SAP QM, ETQ, MasterControl, Trackwise, or in-house systems). What changes is that every CAPA is tied back to the specific control that triggered it. Closure verification is automated against the underlying control returning to PASS state. We don't replace what works in your plant. We connect it.
Pilot: 8–12 weeks for a single plant + 1–2 regulator frameworks (typically Schedule M for pharma, IATF for auto). Plant rollout: 12–18 weeks for full plant + all relevant frameworks. Multi-plant: 6–9 months for hub-and-spoke architecture across 3–5 plants. Most customers see their first generated audit pack within 60 days of pilot kickoff.
TrusTwin is priced as a Layer 5 module on the Wistwin platform — Comply tier. Pricing is per-plant per-year, with a minimum commitment for the foundational AssetTwin layer. Indian customers in the ₹100–500 Cr revenue band typically see an 11-month payback driven by audit-prep compression and reduced consulting fees alone. Book a TrusTwin demo for a tailored quote against your plant footprint.
TrusTwin's IATF 16949:2016 framework includes the standard's 412 base controls plus extensions for the ten most common Indian Tier-1 customer-specific requirements (CSRs) — Tata Motors, Mahindra, Maruti Suzuki, Hyundai, Toyota Kirloskar, Volkswagen, Stellantis, Bajaj, TVS, Hero. CSRs are configurable per customer. Our deployment team includes ex-IATF lead auditors with tier-1 plant audit experience.
Yes. TrusTwin runs on AWS Mumbai (ap-south-1) by default. On-premises deployment is available for customers with regulatory data-residency requirements. The platform is DPDP Act-compliant, ISO 27001 certification is in progress (Q3 2026 target), and SOC 2 Type II is on the 2027 roadmap.
Hub-and-spoke architecture. Each plant runs its own local TrusTwin instance reading from the local AssetTwin. A central corporate TrusTwin reads aggregated control status from all plants. Group CFOs and Quality Heads see one dashboard across the entire manufacturing footprint, while plant-level EHS heads work in their local view. Audit packs can be generated at plant or group level on demand.
The 4-minute benchmark

Where does your plant stand on TrusTwin readiness?

Take the DMM Check™. Get a personalised audit-readiness score, a benchmark against 200+ Indian plants, and the top three regulator frameworks TrusTwin should activate first for your plant.

India work emails only. No sales call until you ask.