Practical resources for Plant Heads, EHS Heads, QA Heads, and CFOs running Indian manufacturing plants. Built around BRSR Core, Schedule M, IATF 16949, Factories Act, NFPA 25 and the real-world audit cycles you face. Free. India-anchored. Every download routes you back to a working solution — not a sales pitch.
Start with the ITM Readiness Checklist if your plant audit prep takes weeks. More resources rolling out fortnightly.
A 42-point readiness checklist covering inspection lifecycle, calibration cycles, statutory due-date tracking, work-order automation, and audit-evidence preparation. Mapped to NFPA 25, IS 7388, Schedule M Annex 3, IATF 16949 calibration, OISD, and Factories Act. Print, walk the plant, score yourself.
Download the checklistA Tier-1 FMCG bottler in Karnataka deployed InspectWin™ from contract signature to go-live in 15 calendar days. The narrative: how the asset master loaded, why the form pack was customised in 48 hours, what the first audit-ready PDF looked like, and how 100,000+ inspection man-hours were saved. All numbers India-anchored.
Read the caseThese resources are scheduled for the next 8 weeks. Want early access? Take the DMM Check™ — we'll route you to the resource you need first.
12-month fire-protection-system inspection calendar mapped to Indian plant operating cycles. Cross-references IS 3844 + NBC. Frequency tables for sprinklers, hydrants, fire pumps, detection, alarms. PDF + Excel.
Equipment qualification + calibration cycle template for Indian pharma plants under revised Schedule M (2024). IQ/OQ/PQ protocols, calibration master list, frequency matrix, audit-trail format.
Statutory crane and lifting-tackle inspection forms aligned to Factories Act 1948 + Maharashtra/Gujarat/Tamil Nadu state rules. Walk-around checklist, defect tagging, escalation matrix.
Excel calculator that benchmarks your OEE against Indian-plant baselines by sector and plant size. Availability × Performance × Quality with India-specific downtime cause-codes pre-loaded.
9-indicator readiness check for top-1000 listed manufacturers. Data-source mapping for energy, water, GHG, waste, packaging, workforce, safety, CSR. Assurance-ready checklist by BRSR auditor.
XLSX workbook that sizes the ROI of an Indian energy management program. State-DISCOM tariff structures (9 states), PAT cycle SEC math, ESCert position. Pre-loaded for cement, steel, textiles, chemicals.
Take the DMM Check™ — our 4-minute Digital Maturity Assessment. We'll route you to the right resource and the right Wistwin module for your plant's current state.