Resources for Indian plants

Toolkits. Checklists. India-context.

Practical resources for Plant Heads, EHS Heads, QA Heads, and CFOs running Indian manufacturing plants. Built around BRSR Core, Schedule M, IATF 16949, Factories Act, NFPA 25 and the real-world audit cycles you face. Free. India-anchored. Every download routes you back to a working solution — not a sales pitch.

Available now

The active library.

Start with the ITM Readiness Checklist if your plant audit prep takes weeks. More resources rolling out fortnightly.

Coming soon

Rolling out fortnightly.

These resources are scheduled for the next 8 weeks. Want early access? Take the DMM Check™ — we'll route you to the resource you need first.

// Compliance · NFPA 25

NFPA 25 India Inspection Calendar

12-month fire-protection-system inspection calendar mapped to Indian plant operating cycles. Cross-references IS 3844 + NBC. Frequency tables for sprinklers, hydrants, fire pumps, detection, alarms. PDF + Excel.

Sprint 2 · D+14 EHS Heads
// Compliance · Schedule M

Schedule M Annex 3 Calibration Kit

Equipment qualification + calibration cycle template for Indian pharma plants under revised Schedule M (2024). IQ/OQ/PQ protocols, calibration master list, frequency matrix, audit-trail format.

D+30 Pharma QA Heads
// Operations · Factories Act

Factories Act Form 8 Crane Inspection Pack

Statutory crane and lifting-tackle inspection forms aligned to Factories Act 1948 + Maharashtra/Gujarat/Tamil Nadu state rules. Walk-around checklist, defect tagging, escalation matrix.

D+30 Plant Engineers + Safety
// Operations · OEE

OEE Calculator for Indian Plants

Excel calculator that benchmarks your OEE against Indian-plant baselines by sector and plant size. Availability × Performance × Quality with India-specific downtime cause-codes pre-loaded.

D+45 Plant Heads + Ops
// Compliance · BRSR Core

BRSR Core Readiness Checklist

9-indicator readiness check for top-1000 listed manufacturers. Data-source mapping for energy, water, GHG, waste, packaging, workforce, safety, CSR. Assurance-ready checklist by BRSR auditor.

D+45 CFO + Sustainability
// Energy & ESG · ISO 50001

Energy Audit ROI Workbook

XLSX workbook that sizes the ROI of an Indian energy management program. State-DISCOM tariff structures (9 states), PAT cycle SEC math, ESCert position. Pre-loaded for cement, steel, textiles, chemicals.

D+60 CFO + Energy Manager
Plant Head
OEE, downtime root-cause, inspection register, statutory audit readiness.
EHS Head
Factories Act, NFPA 25, IS 14489, BRSR safety LTIFR, AviraTwin live watch.
QA Head
Schedule M Annex 3, IATF 16949 calibration, ZDHC chemical inventory.
CFO & Sustainability
BRSR Core 9 indicators, PAT cycle SEC, ISO 50001 ROI, ESG buyer scorecards.
The 4-minute benchmark

Don't know which resource to start with?

Take the DMM Check™ — our 4-minute Digital Maturity Assessment. We'll route you to the right resource and the right Wistwin module for your plant's current state.